July 14, 2007

Crane Operations

According to experts, logging done by the crane is quite different from the usual Crane Operator at building sites where construction cranes are usually used.

The mental strain is much greater during logging operations because of the high number of crane and boom movements per unit of time. For example, a swinging boom caused by lifting a tangled tree makes the driver apprehensive of overturning the vehicle and increases his mental strain as well. Apart from other factors the driver's previous experience with logging operations has an influence on the logging performance because crane operators often have difficulties when they are logging trees for the first time.

This blog post was based on information provided by Blogitive. For more information, please visit Blogitive.com.

No comments: